Russian River Brewing Company Windsor, CA

New 75-barrel brewery, tasting room, and restaurant

  • Designed process, equipment layout to optimize production
  • Sized and specified major equipment
  • Coordinated process installation with the building architect, mechanical and electrical contractors, and equipment suppliers
  • Designed, engineered, and installed equipment, process and utility piping and support systems
  • Provided on-site project management and installation crews for the installation of new brewhouse, fermentation suite, filtration, malt handling, and CIP equipment
  • Developed and drafted electronic 3D models, P&IDs, and construction support drawings
  • Designed, installed, and commissioned process control systems for process and reclaim water systems and distribution
  • Installed state-of-the-art waste water treatment system which converts waste water to clean reclaim water, cuts operational costs, and allows Russian River to achieve their sustainability goals
Vinnie Cilurzo, Co-owner

“We selected Barnum Mechanical because they have designed and built so many breweries.  Not only were we impressed by how well the Barnum team cooperated to get things done, the quality of work is incredible.  If another vendor needed something such as a cable tray, Barnum found time to get the work done efficiently all the while still staying on schedule with their own work.  There was no arguing about whose job it was, they just got it done for the good of the project.  Additionally, Barnum was instrumental in the design phase too- We had ideas about what we wanted and with so much brewery experience Barnum was able to help shape the design and the overall process.  We ended up with everything we wanted and more.  It was great working with them!”